Close Ad
Back To Listing

Scheduled Roadworks at the CUC Roundabout (RaB) – Phase 1 opened on Sunday March 15th 2026

Local News 2 hour ago Follow News

Scheduled Roadworks at the CUC Roundabout (RaB) – Phase 1 opened on Sunday March 15th 2026

Phase 1 of the CUC Roundabout opened on Sunday March 15th 2026; please see layout below.

Motorists are advised to exercise patience, caution, adhere to the posted speed limit of 25 mph, and remain alert for large trucks and heavy equipment operating along the route.

Drivers are reminded to follow the basic rules of roundabout navigation:

• Yield to vehicles already in the roundabout, giving way to the right

• Travel in a clockwise direction around the central island

• Signal appropriately when exiting

The NRA appreciates the public’s patience and cooperation as work progresses on this important infrastructure project. Once completed, the CUC RaB will provide improved connectivity and support the long-term development of the eastern districts.


Comments (0)

We appreciate your feedback. You can comment here with your pseudonym or real name. You can leave a comment with or without entering an email address. All comments will be reviewed before they are published.

* Denotes Required Inputs